Shah & Talati was assigned the fast paced project of manufacturing of Pre-engineered buildings by Everest Industries. The project started in October 2013 and went into production by March 2014. The factory was designed to suit a separate entry of incoming material and fabricated material with necessary curvatures to suit large trailer movements.  The stacking area for raw material which is primarily plates was designed for a floor loading of 20 ton/sqm. The building showcases various features which Everest can provide to their customers.

SCOPE:
Architectural, Structural, Civil Utilities, Electrical, Contract Management, Site supervision

Dahej
Year 2013 – 2014